Bathroom Fitters

Scroll down to find out more

We are 'full fit', design, supply and installation bathroom fitters using low maintenance PVC panelling, Dumawall tiles. Our services include removing and disposing of your old bathroom. All workmanship 100% fully guaranteed.

all included services we offer with our bathroom deals

Strip out old bathroom

We strip out and dispose of your old bathroom suite and all the old tiles, floorings and building waste.

Full design service

Included as part of your free survey and quotation. We think outside the box and come up with great contemporary designs

All Plumbing Work

This is a no-brainer, we wouldn't offer much of a service without the plumbing!.

All Plastering work

Should it be required as part of your bathroom refurbishment. In addition we can do remodelling, raising ceilings, moving fixtures

All electrical work

LED lighting, extractor fans even the latest audio-visual, we have you covered

After sales

We have the best in the business and offer a 24 hour response for any snags or issues with the refurbishment

Don't take our word for it (although we are trustworthy)



Play video


Click on the video above to hear from one of our customers

Client testimonial

The service GH Interiors provided was first class. They were very reliable and professional. They turned up on time. Nothing was too big or too small for them to do for us and everything has been carried out to an exceptionally high quality

Laura Carson / Belfast


Mr & Mrs Reid

GH Interiors was recommended to by my brother and sister, who had both had their bathrooms refurbished by Geoff and his team. We to wanted someone to come in and take care of everything, and after seeing the job they did for my brother and sister we wouldn't have went to anyone else! The lads were very professional and totally transformed our old out dated bathroom into a modern master piece. Everyone was very clean and tidy which we were very impressed with and nothing was ever any trouble. A first class job!.

Mr & Mrs Reid / Antrim
Mr Dubios

After much thought I decided to take the bath out and put in a walk-in shower so after some research and inviting a few different companies out to price the project, I just got a great vibe from the first meeting with Barry (the surveyor), He assured me that nothing was going to be a problem, and well, I believed him. The men who came where very pleasant and helpful, and everything was completed so quickly I would have no hesitation in recommending GH Interiors to anyone looking their bathroom refurbished, as I am over the moon with with mine.

Mr Dubios / Carrick
Mrs Briggs

I can not speak highly enough of Geoff and his team, when I was told 2 days to do my whole bathroom from start to finish I couldn't believe it. Everything happened so quickly. I love my new shower and wall panels. They are some work team, as one was finishing another was in and sure enough everything was done in 2 days. I was so happy, the boys love their coffee and we had such a laugh, Charlie is a character! Such a pleasant experience, I can honestly recommend GH Interiors to anyone, a great bunch of lads.

Mrs Briggs / Ballymena

Check out some examples of our bathroom refurbishment projects

All photos and videos are of actual bathroom refurbishment projects GH Interiors have carried out over the last year

Photo & Video Gallery


View More Photos | See more videos

Nobody is perfect

99%Customer Satisfaction

But we try our best
Contact us for a quote

Hear from some of our delighted clients

Mr & Mrs Jamison

Love,love,love my new bathroom! Cannot believe the transformation, 1st class. Have to have a look every-time I walk past the bathroom door. Would highly recommend , Thank-you GH Interiors.

Mr & Mrs Jamison / Newtownabbey
Mrs Madden

I was absolutely delighted with the design and work done on our bathroom project. Geoff project managed the job to the highest level of expertise. I was worried about the hassle and mess but the boys were a tidy team. I've never had such clean workers before! I would like to thank everyone for my lovely bathroom, I cant speak highly enough of GH Interiors.

Mrs Madden / Newtownabbey
Laura Carson

The service GH Interiors provided was first class. They were very reliable and professional. They turned up when they said they would turn up. Each step, the plumbing the panelling, all happened on time. Nothing was too big or too small for them to do for us and everything has been carried out to an exceptionally high quality. I would have no problem recommended GH Interiors to anybody.

Laura Carson / Belfast

A Walk Through of a Typical Bathroom Refurbishment Project


First Call - Quick Response Survey Team

So lets say you like what you see and decide to call us what happens next?

From the first call from an enquiry your details will be taken and emailed through to our quick response survey team , if which case someone will contact you as soon as possible, to choose a time that suits yourself for a call out home survey

Onsite Visit

The surveyor will call out and listen to your ideas for your new bathroom and give his advice when needed, measure up the job, then sit down with various samples of our PVC range for your walls and ceiling and sample boards of various flooring products that we use. The same goes for bathroom sanitary-ware we have a number of brochures to choice from, but don't worry if you still can't decide we have a number of supplier showrooms you can look at.

Contract Drawn Up

If you decide that we are the company for you then all that's left to do before the job starts is get a contact drawn up which puts everything in writing, so there are no hidden costs when the job starts. A small deposit will be taken to secure your fitting date, and then the balance will be paid on completion, only when you're happy with the job.

Day 1 - Things get under way

Our refurbishments take 2-3 days. The first day will be stripping out the old bathroom, removing it from site and plumbing in your new bathroom suite. You're never left without a toilet or washing facilities, everything will be put on stop valves for the boys to take out again the following day.

Day 2 - Full Kit out

The second day will be the full kit out - walls, flooring, ceiling, spotlights, second fixing the bathroom suite and and also drilling any accessories you may want to put up mirrors cabinets etc

Day 3 - Finish up and snag check

The third morning will consist of cleaning everything up to show room condition, doing those extra wee touches and doing the final siliconing and sealing. Job Done!

What are you waiting for?

Play video

Decision time. Well we hope we have answered all your questions by now but either way go ahead and give us a call or send us a message and get the ball rolling. We'll send out our quick response survey team for a free no obligation survey and quotation, so you have nothing to loose. We'll come out and talk you through the process